Planned two week road closure on section of Avon Gorge brought forward
Resurfacing works that will close a section of the Avon Gorge have been brought forward.
West Lothian Council (WLC) had planned to carry out carriageway resurfacing works on the A801/A706 Avon Gorge with works due to start on Monday, August 24.
However, the council has now revealed the works will start earlier than previously announced.
They say the road closure will now begin on Wednesday, August 19 for “a period of up to two weeks”.


A road closure will be in place to facilitate the construction works “due to the nature of the works and the location”.
A diversion route will be in place and local access will be maintained at all times.
A spokesperson for the council said: “The works will consist of lifting the existing surface and replacing it with a new close graded asphalt concrete surface as well as resetting or replacing any defective ironwork and the installation of new high friction surfacing.”
The section of the road closed is on the West Lothian side of the gorge on the uphill stretch towards the traffic lights heading towards Bathgate and onto the A706 until Westfield Roundabout.


Diversion route maps published by WLC show the left fork on the West Lothian side of the bridge heading towards Linlithgow will remain open.